The MEES timeline
The minimum to let non-domestic property in England and Wales is EPC E, and two widely-quoted deadlines have changed: the interim EPC C by 2027 was DROPPED, and EPC B moved to a proposed 2031, narrowed to buildings over 1,000 m² (smaller units stay at E), subject to secondary legislation. Many commercial buildings still sit at D/E, so the retrofit case has not gone away — the date has.
Why PPA delivers MEES uplift
Adding solar PV improves the EPC calculation — typically lifting a property by 1-2 letter grades depending on existing fabric and PV capacity.
How much PV you need
For a typical 5,000 m² UK office building rated EPC D, lifting toward B usually requires:
- Solar PV equivalent to 30-50% of annual electricity demand
- LED lighting throughout (separate from PPA)
- Roof / cavity insulation upgrades where applicable
- Heat pump consideration (where heating is fossil-fuel)
Working back from the proposed 2031 EPC B target
- 2031: proposed EPC B target for buildings over 1,000 m² (subject to secondary legislation)
- 2030: system commissioned, EPC re-issued
- 2029: heads-of-terms signed, build underway
- 2028: provider selection complete
- 2027: RFP issued to providers
- Now: roof condition + EPC baseline assessment
What landlords need to do now
- Run current EPC assessments — know your baseline
- Model PV potential per building
- Engage tenants — if cost is passed through service charge or rent
- Co-ordinate with planned LED + insulation retrofits
See what tariff your site qualifies for
A 60-second form gives us enough to review your site. We reply by email.
Get an indicative PPA tariffCheck what your roof could earn under a PPA
Meeting MEES 2027 with a Solar PPA — tell us about your site and we reply by email.