Factories & Manufacturing · Cardiff

Solar PPA for factories & manufacturing in Cardiff

Named industrial estates suited to a factories & manufacturing PPA in Cardiff include Cardiff Bay, Wentloog Industrial Park, Cardiff Industrial Park. Indicative 2026 tariff 10–14 p/kWh on a 250kWp–2MWp system.

Last reviewed 19 November 2026 5 min read By Factories & Manufacturing · Cardiff

Quick answer: factories PPAs in Cardiff

A solar PPA for factories & manufacturing in Cardiff typically prices at 10–14 p/kWh in year one on a 250kWp–2MWp system — versus 21–25 p/kWh grid import. The provider funds and maintains the system over 15–25 years; you buy only the power generated, with no capital outlay.

Not sure a PPA fits your site? Run the two-minute suitability check or send your site details for an indicative p/kWh range.

Wentloog and Cardiff's eastern industrial parks

Cardiff gathers its larger manufacturing and distribution sites to the east of the city at Wentloog Industrial Park and Cardiff Industrial Park, with further commercial premises around Cardiff Bay and Atlantic Wharf. These broad, low-rise footprints are natural hosts for rooftop generation, and a solar PPA lets a Cardiff factory take that generation without funding, owning or maintaining the system itself — the developer handles all of it.

Why factories suit the model

A manufacturing site draws its heaviest power during the working day, which is when a roof array is producing, so self-consumption stays high and little is exported. That alignment is why factories return more from on-site solar than most sectors. Under a PPA the occupier buys output at a fixed unit price of 10–14p; with systems typically between 250kWp and 2MWp and a local commercial bill near £45,000, larger plants see yearly savings land in the £35k–£280k bracket. Weigh a PPA against buying the system outright on our finance options comparison.

Welsh policy and grid

There is no Business Wales solar grant: a Welsh firm that wants to own its array would look at the Development Bank of Wales Green Business Loan Scheme, a loan of £1,000 to £1.5m that names solar PV, and the Welsh Government Energy Service is for public bodies and community groups, not private businesses. South Wales connects via National Grid Electricity Distribution, so early engagement on capacity helps — a consideration shared by sites in Newport, Barry and Caerphilly.

  • Nothing to buy and nothing to maintain
  • A contracted rate insulated from wholesale swings
  • Measured carbon savings tied to One Planet Cardiff

Explore the factory solar route in full, or the Cardiff commercial solar overview.

Donovan Fawcett · Director, SEO Dons Ltd Director responsible for this site. Editorial policy & independence.

Get a PPA tariff for your Cardiff factories & manufacturing

60-second form. We reply by email.

No spam. Your enquiry is emailed to SEO Dons Ltd and we reply by email. This site's screening floor is about 50kWp.

Indicative tariff for factories & manufacturing in Cardiff

A 60-second form gives us enough to review your factories & manufacturin site in Cardiff. We reply by email.

Get an indicative PPA tariff
Get PPA quote