Resource

UK Solar PPA Diligence Checklist

A 10-section pre-signing diligence checklist for UK commercial off-takers entering a solar Power Purchase Agreement. Covers provider financial standing, contract structure, technical scope, O&M, M&V, REGO mechanics, end-of-term options, tax + accounting and off-taker preparation.

Last reviewed 19 November 2026 8 min read By Resources

Use this as a starting framework — adapt to your specific deal structure. For a hands-on diligence review of a specific term sheet, send us the document via the contact form.

1. Provider financial diligence

  • Companies House filing history (last 5 years)
  • Audited accounts of provider entity and parent (last 3 years)
  • Funding stack documentation (debt, equity, LP base)
  • Reference deals — minimum 3 comparable in last 24 months
  • Insurance evidence: PI £5m+, PL £10m+, system insurance

2. Contract structure

  • Term length matches site tenure with 5+ year buffer
  • Escalator clearly defined: type (fixed/RPI/CPI), cap, floor
  • Off-taker covenant requirement explicit
  • Change-of-control assignment provisions
  • Force majeure carve-outs reasonable
  • Change-in-law allocation defined
  • Termination clauses with capped buy-out formula

3. Technical scope

  • EPC contractor identity, MCS + NICEIC accreditations
  • Panel + inverter brands disclosed with manufacturer warranties
  • Roof penetration warranty separate from panel warranty
  • Performance ratio guarantee: 78%+ over rolling 12 months
  • P50 + P90 yield modelling included in heads-of-terms
  • Site survey report (structural + electrical + planning)

4. O&M provisions

  • 24/7 remote monitoring access for off-taker
  • Annual on-site inspection schedule + thermal imaging
  • Inverter replacement included (typically year 12-15)
  • Soiling cleaning protocol
  • Fault response SLA (agreed target)
  • Insurance maintained for term

5. M&V protocols

  • Independent generation meter (not provider-owned)
  • IPMVP Option B methodology
  • Performance ratio dispute mechanism with independent assessor
  • Read-out data access for off-taker

6. REGO + green claim

  • REGO certificate transfer explicit
  • Annual retirement statement against off-taker consumption
  • Audit trail via Ofgem REGO register
  • Right to verify retirement

7. SEG / export arrangement

  • SEG income assignment clarified (off-taker preferred)
  • Export meter independent of provider
  • Right to switch SEG supplier mid-contract

8. End-of-term options

  • Extension option with pre-agreed tariff bands or formula
  • Buy-out option at fair market value with defined valuation methodology
  • Right of first refusal if provider divests
  • Removal option at no cost to off-taker

9. Tax & accounting confirmation

  • IFRS 16 treatment confirmed with auditor
  • HMRC corporation tax deductibility confirmed
  • VAT recovery on payments
  • SEG income tax treatment

10. Off-taker preparation

  • Internal stakeholder alignment (finance, ops, facilities, legal)
  • Board approval where required
  • Site lease term verification
  • Roof survey commissioned independently
  • Insurance coordination (existing building cover)
Donovan Fawcett · Director, SEO Dons Ltd Director responsible for this site. Editorial policy & independence.

Got a term sheet you want reviewed?

Send us the heads-of-terms or full PPA and we'll review against the diligence framework — no charge for first review.

Get an indicative PPA tariff

See what PPA providers would quote you

UK Solar PPA Diligence Checklist — tell us about your site and we reply by email.

No spam. Your enquiry is emailed to SEO Dons Ltd and we reply by email. This site's screening floor is about 50kWp.

Get PPA quote