Renewable energy certificates are how a business proves the electricity it used was renewable. Great Britain does not issue RECs: it issues REGOs, one per megawatt hour. The distinction matters most when you sign a solar PPA, because the certificates from your own roof are not automatically yours.
What are renewable energy certificates in the UK?
In the UK, renewable energy certificates are REGOs — Renewable Energy Guarantees of Origin. Ofgem issues one REGO per megawatt hour of eligible renewable output. “REC” is the American term; ask for RECs in Great Britain and what you will be offered is a REGO. They can be bought and sold separately from the electricity itself, which is why a solar PPA has to say who keeps them.
Not sure a PPA fits your site? Run the two-minute suitability check or send your site details for an indicative p/kWh range.
Key takeaways
- UK renewable energy certificates are REGOs, issued one per MWh of eligible renewable output. The UK is not an I-REC issuing country.
- REGOs are issued on gross generation — including the electricity you consume on site — so your roof produces certificates whether or not you ever see them.
- Under the GHG Protocol, consuming on-site power whose certificates were sold means you forfeit the renewable claim on those units. “Behind the meter, so it is mine” is not how the accounting works.
- An unused GB REGO is cancelled 16 months after its month of generation (19 in Northern Ireland).
- There is no official REGO price. Treat any number you are quoted as a market estimate, and get the allocation written into the PPA rather than priced later.
Renewable energy certificates in the UK are REGOs
If a customer, an investor or a US parent company asks for your renewable energy certificates, they are asking for the instruments that prove the electricity you used came from renewable generation. In Great Britain those instruments are REGOs — Renewable Energy Guarantees of Origin — created by S.I. 2003/2562 and administered by Ofgem. Ofgem’s scheme page puts the unit plainly: one REGO certificate is issued per megawatt hour of eligible renewable output.
“REC” is a North American term. There is no GB instrument called a REC, and the UK is not an I-REC (I-TRACK) issuing country, so a request for “RECs” or “I-RECs” for a UK site is answered with REGOs. RE100 treats the UK as its own market for exactly this reason. The practical consequence is small but it trips up procurement teams: the paperwork you hand over will not use the word on the request.
The certificates are separable from the power. A generator can sell you electricity and sell the certificates to someone else entirely — the register, not the invoice, is the proof of who holds them. That is the single fact that decides what a solar PPA leaves you able to say.
Unit and GB scheme: Ofgem, REGO scheme page, read 19 Nov 2026. Legal basis: S.I. 2003/2562.
Your roof generates certificates even when you use the power yourself
This is the part that surprises people. Ofgem issues REGOs on gross generation. A station that uses some or all of its output on site is still eligible, so a rooftop array behind your own meter is minting certificates for every megawatt hour it produces, including the units that never touch the grid.
Someone owns those certificates. Under a power purchase agreement the generator — or the fund that financed the array — owns the asset, and unless the contract says otherwise it owns the certificates the asset produces. They can be sold on. Nothing about the electrons flowing straight into your switchboard changes that.
So there are two separate questions to settle before signing, and most draft contracts answer only the first: what do I pay per kWh, and what am I allowed to claim. For how the clauses themselves are drafted, see who owns the REGOs under a solar PPA.
Gross-generation and on-site eligibility: Ofgem, REGO Guidance for Generators, Agents and Suppliers, section 5.10, read 27 Sep 2026.
If the certificates were sold, you cannot claim the electricity as renewable
The GHG Protocol Scope 2 Guidance is explicit: where a company consumes electricity from a facility — on site or by direct line — whose certificates have been sold, that company forfeits the renewable claim on those units. The buyer of the certificates gets the claim.
Read against the gross-generation rule above, that produces an outcome worth stating in full. You can have solar panels on your own roof, consume the output behind your own meter, and still be required to report that electricity as grid-average in your Scope 2 market-based figures — because the REGOs went to someone else. Businesses have signed PPAs believing the opposite, and it is the most expensive misunderstanding in the whole instrument.
What to do about it is simple once it is on the table: make the REGO allocation an explicit term. Either they transfer to you, or they are voluntarily returned for cancellation naming you as the beneficiary, or you accept that the claim is not yours and price the deal accordingly. Any of the three is fine. Silence is not.
Forfeiture rule: GHG Protocol Scope 2 Guidance (2015), section 6.4.1, read 27 Sep 2026. This site is an information publisher, not your auditor — confirm the treatment with whoever signs off your reporting.
Cancellation, shelf life and the fuel mix disclosure calendar
A certificate is only useful while it is alive. An unused GB REGO is cancelled 16 months after the month in which the electricity was generated; a Northern Ireland REGO lasts 19 months. If you are collecting certificates to support a claim, that clock is the constraint on how long you can sit on them.
To use a REGO for a carbon claim, the holder voluntarily returns it for cancellation and names the reason — RE100, carbon reporting, or other — and Ofgem issues a cancellation letter naming the beneficiary. GB law has no concept of “retiring” a certificate, which is why the paperwork uses that wording. The conditions are that it happens within the 16 months, for UK consumption, and only for electricity already consumed.
Separately, suppliers use REGOs for Fuel Mix Disclosure under S.I. 2005/391. That period runs 1 April to 31 March; suppliers must hold their certificates by midday on 1 July, when Ofgem redeems them; and they must disclose the mix to customers by 1 October. It matters to a business buyer mostly as context: a green tariff must be fully backed by REGOs, so the certificates backing your supplier’s tariff are already spoken for and are not available to you twice.
Shelf life, cancellation process and FMD deadlines: Ofgem REGO guidance, read 27 Sep 2026; S.I. 2005/391.
EU GoOs, and why a European certificate will not do
Guarantees of Origin issued in the EU are a different instrument. The EU stopped recognising UK REGOs from 1 January 2021, and the traffic does not run the other way either: Ofgem’s scheme page states that from the disclosure period beginning 1 April 2023 and onwards, GoOs are no longer recognised for use in GB fuel mix disclosure, Feed-in Tariff annual levelisation, or Contracts for Difference.
EU GoOs do remain valid for Northern Ireland fuel mix disclosure, which is a genuine difference between the two UK markets rather than a technicality. If you are reporting across both, do not assume one certificate pool covers both.
The compare-the-families version of this, including I-RECs, is on REGOs, GoOs and I-RECs compared.
GB non-recognition from 1 Apr 2023: Ofgem, REGO scheme page, quoted verbatim, read 19 Nov 2026.
What a REGO is worth, and why nobody can quote you a price
There is no official REGO price. No regulator publishes one and no exchange sets one, so any figure you are given is a market estimate from whoever is giving it. The most widely cited public number came from a written answer on 2 May 2025, in which the minister said credible external estimates suggested the latest spot market price was around £7 a certificate, against roughly 130 million certificates a year and a market of about £910 million.
Those figures are quoted here with their date because they will drift, and a stale price presented as current is worse than no price. Use the order of magnitude, not the number: on a 1 MWp rooftop array generating roughly 950,000 kWh a year — about 950 certificates — the certificates are a real but secondary line next to the value of the electricity itself.
Which is the useful way to approach the negotiation. The certificates are worth too little to fight over for their own sake and too much to leave unmentioned, because what is really at stake is your ability to make a renewable claim at all. Get the allocation written down; see the PPA rates page for where the electricity price should land, and REGO certificates for how issuing and transfer work mechanically.
Price estimate, volume and market size: UIN 47811, answered 2 May 2025. Ofgem publishes no price; the scheme page carried none when read on 19 Nov 2026. The 950,000 kWh figure is this site’s standard 1 MWp UK rooftop modelling assumption, not a measured output.
Sources for every figure on this page
| Figure on this page | Value | Source | Verified |
|---|---|---|---|
| One certificate = 1 MWh | 1 REGO per MWh of eligible renewable output | Ofgem, REGO scheme page — quoted verbatim | 19 Nov 2026 |
| GB issues REGOs, not RECs | REGO, under S.I. 2003/2562 | S.I. 2003/2562 | 27 Sep 2026 |
| Certificates are issued on GROSS output, including electricity you use on site | Guidance 5.10 | Ofgem, REGO Guidance for Generators, Agents and Suppliers (read 27 Sep 2026) | 27 Sep 2026 |
| Consuming on-site power whose certificates were sold forfeits the renewable claim | Scope 2 Guidance §6.4.1 | GHG Protocol Scope 2 Guidance (2015) | 27 Sep 2026 |
| Unused certificate lifetime | 16 months from the month of generation (GB); 19 months (NI) | Ofgem REGO guidance (read 27 Sep 2026) | 27 Sep 2026 |
| Fuel Mix Disclosure period and deadlines | 1 Apr–31 Mar; suppliers hold by midday 1 Jul; disclose by 1 Oct | S.I. 2005/391 and Ofgem guidance (read 27 Sep 2026) | 27 Sep 2026 |
| EU GoOs in GB fuel mix disclosure | Not recognised from the period beginning 1 Apr 2023 | Ofgem, REGO scheme page — quoted verbatim | 19 Nov 2026 |
| Official REGO price | None exists. ~£7 per certificate was an estimate quoted in a written answer | UIN 47811, 2 May 2025 | 27 Sep 2026 |
Where a row is dated 27 Sep 2026 the primary source was read then and is cited with that date rather than re-asserted as current. Ofgem’s scheme page does not state a version for the REGO guidance document, so no edition is claimed here. gov.uk/guidance/renewable-energy-guarantees-of-origin-rego returned HTTP 404 on 19 Nov 2026 and is deliberately not linked.
Frequently asked questions
Does the UK issue renewable energy certificates (RECs)?
Not under that name. Great Britain issues REGOs — Renewable Energy Guarantees of Origin — at one certificate per megawatt hour of eligible renewable output. “REC” is the North American term, and the UK is not an I-REC issuing country, so a request for RECs covering a UK site is satisfied with REGOs. RE100 treats the UK as a distinct market for this reason.
Who owns the renewable energy certificates in a solar PPA?
Whoever the contract says, and if it says nothing, the generator — because the generator owns the asset that produced them. Ofgem issues REGOs on gross generation including electricity used on site, so your roof produces certificates even behind your own meter. Make the allocation an explicit term: transferred to you, cancelled naming you as beneficiary, or retained by the provider with the price reflecting it.
Can I say my electricity is renewable if my PPA provider keeps the certificates?
Under the GHG Protocol Scope 2 Guidance, no. Section 6.4.1 is explicit that a company consuming power from an on-site or direct-line facility whose certificates were sold forfeits the renewable claim on those units. Confirm your own reporting treatment with whoever signs it off, but do not assume that generating on site settles the question.
How long does a REGO last?
An unused GB REGO is cancelled 16 months after the month of generation; a Northern Ireland REGO lasts 19 months. To use one for a carbon claim it must be voluntarily returned for cancellation within that window, for UK consumption, and only for electricity already consumed.
What is a REGO worth?
There is no official price. The most-cited public figure is from a written answer of 2 May 2025, which put credible external estimates of the spot price at around £7 a certificate, with roughly 130 million certificates a year and a market of about £910 million. Treat that as dated context rather than a current quote.
Can I use an EU Guarantee of Origin in the UK?
Not for GB fuel mix disclosure. Ofgem states that from the disclosure period beginning 1 April 2023 onwards, GoOs are no longer recognised for GB FMD, Feed-in Tariff annual levelisation, or Contracts for Difference. EU GoOs do remain valid for Northern Ireland fuel mix disclosure.
Related on this site
Get an indicative PPA tariff for your site
A 60-second form gives us enough to review your site. We reply by email.
Get an indicative PPA tariffGet a p/kWh figure for your own building
Renewable Energy Certificates in the UK — tell us about your site and we reply by email.