500kWp PPA — UK 2026 indicative cost & PPA tariff
For a 500kWp PPA on-site solar system the UK 2026 indicative capex is £395,000–£500,000; under a PPA the year-1 tariff sits at 11–14 p/kWh. Large factories, refrigerated distribution, NHS Trust acute sites, university campuses, food processors.
2026 indicative numbers
| System size | 500kWp PPA |
| Indicative capex (cash) | £395,000–£500,000 |
| PPA tariff (year 1) | 11–14 p/kWh |
| Annual generation | 475,000 kWh |
| Indicative annual saving | £52,250+ (vs 24 p/kWh grid) |
| Typical audience | Large factories, refrigerated distribution, NHS Trust acute sites, university campuses, food processors. |
| Off-taker requirement | 20+ year tenure, £180k+ annual electricity spend, investment-grade off-taker |
Grid import benchmark: 21–25 p/kWh for Medium to Extra Large non-domestic consumers (all-band average 24.14 p/kWh). Source: DESNZ Quarterly Energy Prices, table 3.4.2 (including CCL, excluding VAT), Q1 2026, published 30 June 2026. Re-verified 1 September 2026.
Half a megawatt is an infrastructure decision
By 500kWp a solar PPA behaves less like an energy purchase and more like a piece of site infrastructure that someone else has funded. The £395,000–£500,000 install would be a board-level capital request if bought outright; under a PPA it lands as an operating cost against the roughly 475,000 kWh generated each year, at 11–14 p/kWh. The off-takers at this scale — large factories, refrigerated distribution, NHS acute sites, universities, food processors — tend to carry the steady, high daytime demand that makes the array pay.
Metering and structure need real diligence
Sites this size sit on half-hourly metering, so a provider models your consumption profile in genuine detail rather than off an annual bill. Two things get tested hard: whether the roof can bear the array for a quarter-century — a structural survey is standard, and remedial work can be a precondition — and how much of the 475,000 kWh you actually self-consume versus export. Refrigerated and process loads score well, because demand runs around the clock.
The covenant bar is high
A 20-to-25-year contract of this value needs a strong counterparty. Expect a requirement for an investment-grade off-taker and yearly electricity costs above £180,000. Public-sector and institutional buyers clear that comfortably; a private operator may need audited accounts or group support to get there.
- Investment-grade off-taker covenant
- A 20-to-25-year contract horizon
- Electricity costs above £180,000 each year
- Structural roof survey passed or remediation agreed
How to run the process
Get the sequence right and a 500kWp PPA is undramatic. Learn how an on-site PPA actually operates, size the opportunity with the savings estimator, then shortlist funders with a track record at this scale through the directory of providers.
Get a 500kWp PPA PPA tariff
60-second form. We'll match your site to providers comfortable at the 500kWp PPA band and return an indicative tariff within one working day.
Size-specific FAQs
What is the typical capex for a 500kWp PPA system in 2026?
For a 500kWp PPA system in 2026, indicative capex is £395,000–£500,000. Under a PPA you don't pay this directly — the provider funds the system and you pay a per-kWh tariff.
What annual generation should I expect from a 500kWp PPA?
In the UK Midlands a 500kWp PPA system typically generates around 475,000 kWh/year — about 950 kWh/kWp. Southern UK gets 1,050; Scotland 850. We model your specific postcode in the calculator.
Who is a 500kWp PPA PPA suited to?
Large factories, refrigerated distribution, NHS Trust acute sites, university campuses, food processors.
What's the off-taker requirement for a 500kWp PPA PPA?
20+ year tenure, £180k+ annual electricity spend, investment-grade off-taker
Get a 500kWp PPA indicative tariff in 24 hours
A 60-second form. We'll match you to PPA providers comfortable at the 500kWp PPA band and return a 11–14 p/kWh indicative tariff.
Get an indicative PPA tariffMore in this series
- 50kWp PPA — UK 2026 indicative cost & PPA tariff
- 100kWp PPA — UK 2026 indicative cost & PPA tariff
- 250kWp PPA — UK 2026 indicative cost & PPA tariff
- 5MWp PPA (ground-mount or large rooftop) — UK 2026 indicative cost & PPA tariff
- 10MWp+ PPA (utility-scale) — UK 2026 indicative cost & PPA tariff
- 2MWp PPA — UK 2026 indicative cost & PPA tariff