PPA size: 500kWp PPA

500kWp PPA — UK 2026 indicative cost & PPA tariff

For a 500kWp PPA on-site solar system the UK 2026 indicative capex is £395,000–£500,000; under a PPA the year-1 tariff sits at 11–14 p/kWh. Large factories, refrigerated distribution, NHS Trust acute sites, university campuses, food processors.

Last reviewed 19 November 2026 5 min read By Cost · 500kWp PPA

2026 indicative numbers

System size500kWp PPA
Indicative capex (cash)£395,000–£500,000
PPA tariff (year 1)11–14 p/kWh
Annual generation475,000 kWh
Indicative annual saving£52,250+ (vs 24 p/kWh grid)
Typical audienceLarge factories, refrigerated distribution, NHS Trust acute sites, university campuses, food processors.
Off-taker requirement20+ year tenure, £180k+ annual electricity spend, investment-grade off-taker

Grid import benchmark: 21–25 p/kWh for Medium to Extra Large non-domestic consumers (all-band average 24.14 p/kWh). Source: DESNZ Quarterly Energy Prices, table 3.4.2 (including CCL, excluding VAT), Q1 2026, published 30 June 2026. Re-verified 1 September 2026.

Half a megawatt is an infrastructure decision

By 500kWp a solar PPA behaves less like an energy purchase and more like a piece of site infrastructure that someone else has funded. The £395,000–£500,000 install would be a board-level capital request if bought outright; under a PPA it lands as an operating cost against the roughly 475,000 kWh generated each year, at 11–14 p/kWh. The off-takers at this scale — large factories, refrigerated distribution, NHS acute sites, universities, food processors — tend to carry the steady, high daytime demand that makes the array pay.

Metering and structure need real diligence

Sites this size sit on half-hourly metering, so a provider models your consumption profile in genuine detail rather than off an annual bill. Two things get tested hard: whether the roof can bear the array for a quarter-century — a structural survey is standard, and remedial work can be a precondition — and how much of the 475,000 kWh you actually self-consume versus export. Refrigerated and process loads score well, because demand runs around the clock.

The covenant bar is high

A 20-to-25-year contract of this value needs a strong counterparty. Expect a requirement for an investment-grade off-taker and yearly electricity costs above £180,000. Public-sector and institutional buyers clear that comfortably; a private operator may need audited accounts or group support to get there.

  • Investment-grade off-taker covenant
  • A 20-to-25-year contract horizon
  • Electricity costs above £180,000 each year
  • Structural roof survey passed or remediation agreed

How to run the process

Get the sequence right and a 500kWp PPA is undramatic. Learn how an on-site PPA actually operates, size the opportunity with the savings estimator, then shortlist funders with a track record at this scale through the directory of providers.

Donovan Fawcett · Director, SEO Dons Ltd Director responsible for this site. Editorial policy & independence.

Get a 500kWp PPA PPA tariff

60-second form. We'll reply by email with an indicative tariff for the 500kWp PPA band.

No spam. Your enquiry is emailed to SEO Dons Ltd and we reply by email. This site's screening floor is about 50kWp.

FAQs

Size-specific FAQs

What is the typical capex for a 500kWp PPA system in 2026?

For a 500kWp PPA system in 2026, indicative capex is £395,000–£500,000. Under a PPA you don't pay this directly — the provider funds the system and you pay a per-kWh tariff.

What annual generation should I expect from a 500kWp PPA?

In the UK Midlands a 500kWp PPA system typically generates around 475,000 kWh/year — about 950 kWh/kWp. Southern UK gets 1,050; Scotland 850. We model your specific postcode in the calculator.

Who is a 500kWp PPA PPA suited to?

Large factories, refrigerated distribution, NHS Trust acute sites, university campuses, food processors.

What's the off-taker requirement for a 500kWp PPA PPA?

20+ year tenure, £180k+ annual electricity spend, investment-grade off-taker

Get a 500kWp PPA indicative tariff

A 60-second form. We'll reply by email with an indicative tariff for the 500kWp PPA band (this site's modelled range is 11–14 p/kWh).

Get an indicative PPA tariff
Get PPA quote